Camerun licita un Proyecto Hidroelectrico de 365MW

Sábado, 21 de Octubre de 2017


 

Fuente: CNBC Africa

 

Platinum Power, a Power Africa partner, has pre-qualified a total of 7 consortia for the design and build of one of their hydropower projects in Cameroon, the Makay Hydroelectric project. This project has an expected installed capacity of 365 MW and is located on the Nyong River, in the Nyong-et-Kelle Department, Central region of the Republic of Cameroon. The following candidates have been prequalified:

Acciona Construction / Acciona Industrial / Cooperativa Muratori Cementisti Ravenna; Andrade Gutierrez Engenharia S.A / Andrade Gutierrez Europa, Africa, Asia  S.A / Construtora Barbosa Mello SA; China Ghezouba Group Company / China Energy Engineering Corporation; China State Construction Engineering Corporation / Pearl River Planning Surveying & Designing Company; Mota Engil Africa  NGE Contracting / Besix / SGTM; Sinohydro / Power China. 

This project represents several opportunities for U.S. companies to join any of the selected consortia, in preparation of the upcoming international tender.

Proposal Deadline: No deadline has been posted yet, but the listed consortia will be invited to bid on the final tender, scheduled for launch in the coming weeks.

Ver más noticias

Diseño web: InternacionalWeb
Uso de Cookies Cerrar

Este sitio web utiliza cookies propias y de terceros que analizan el uso del mismo con la finalidad de mejorar nuestros contenidos y su experiencia como usuario. Si continua navegando, consideramos que acepta su uso. No obstante, puede Ud. permitir, bloquear o eliminar las cookies instaladas en su equipo mediante la configuración de las opciones del navegador instalado en el mismo. Encontrará más información en el siguiente enlace política de cookies.