Country: Kenya
Sector: Water
Final client : National Irrigation Board (NIB)
Finish date: 31/12/2024
FOMENTO together with RAESA has designed, installed and trained an irrigation system for Kiambu County:
The most appropriate modern pressurized irrigation system such as Sprinkler irrigation system and Drip irrigation were selected for the agricultural project. The irrigation methods proposed for the project present high performance, low irrigation costs and flexibility such as aluminum pipes sprinkler systems.
The project targets to benefit approximately 3,000 farmers.
PROJECT BENEFITS